Drone aerial view of concrete armour unit installation on the offshore breakwater at Port-La-Nouvelle, France

Témoignage – Bouygues port La Nouvelle

L’entreprise Bouygues a fait appel en urgence à CLAS pour lapose des blocs artificiels la digue offshore a été détruite trois fois par les tempètes hivernale et avec les proc´dures et équipements mis en oeuvre, POSIBLOC™, sonar multifaisceaux et jumeaux numérique, le chantier n’avançait pas. Après 18 mois d’efforts soutenus la digue offshore restait très…

Concrete armour units stored on a barge prior to installation on a port breakwater

Testimonial – Van Oord, Constanta breakwater(Roumanie)

Van Oord appointed CLAS to provide technical support on the Constanța port extension project in Romania. During the Constanța port protection project in Romania, CLAS teams worked alongside Van Oord, providing specialized support for the installation of ACCROPODE™II concrete armour units and independent certification of the breakwater armour layer. The mission entrusted to CLAS Technical…

Vue drone de la digue de La Turballe inspectée et documentée par CLAS

La Turballe Breakwater – CLAS Support and Certification

CHARIER called on CLAS to assist during the extension of the La Turballe breakwater. To call on the expertise of CLAS. All stakeholders involved in this project wished to obtain Class A certification for this major structure. CLAS intervened to achieve this objective. The placement of the X-bloc® units was carried out by divers. X-bloc®…

Vue drone de la digue de Kuantan construite avec l’assistance CLAS et certifiée CLASS A BREAKWATER

Kuantan – Certification CLAS (ECERDC)

The construction of the Kuantan breakwater was experiencing difficulties, and abnormal movements accompanied by multiple unit breakages appeared. ECERDC called on CLAS to assess the structure and then supervise the works. Several months were required to finalize the expert assessment of the structure and to formally establish the causes of the defects. This major structure…