Upper Zakum North Island offshore breakwater

The project

  • Years: 2012–2013
    Project: Upper Zakum North Island
    Country: Abu Dhabi (UAE)
    Contractor: NMDC
    Client: ADNOC
Travaux de construction de la carapace en blocs artificiels sur Upper Zakum North Island.
Déchargement des blocs artificiels sur Upper Zakum North Island pour les travaux de construction de la carapace.

background

NMDC was required to construct four oil islands on the Zakum site, protected by artificial armour units. IDMer (now CLAS) inspectors provided full-time assistance to NMDC throughout the construction works.

Thanks to its complete independence from licence holders, IDMer (now CLAS) was able to deliver fully impartial expertise and certification, with no risk of conflict of interest. This neutrality made it possible to strictly apply its control methods, objectively assess installation quality and ensure the reliability of the structures built on the Zakum islands.

Key figures

Carapace en blocs artificiels certifiée par CLAS sur Upper Zakum North Island.

Role of IDMer (now CLAS)

IDMer, which later became CLAS, acted as an independent consultant with the following assignments:

  • Training all personnel in safety specific to armour unit placement,
  • Training installation teams,
  • Establishing certification procedures and implementing them,
  • Issuing the certification documentation.
Qualité de la carapace en blocs artificiels sur Upper Zakum North Island, certifiée par les experts CLAS.

Result

All four structures were delivered on schedule and accepted without reservations.
The breakwaters were certified CLASS A, and the certification files prepared by IDMer (now CLAS) were included in the as-built documentation (DOE).