Nouvelle Route du Littoral (NRL) — Expert Assessment

The project

YEAR: 2018–2023
PROJECT: Nouvelle Route du Littoral
COMPANY: EGIS
CLIENT: Région Réunion

Défauts de pose sur un ouvrage en blocs artificiels

Background

The four breakwaters of the Nouvelle Route du Littoral showed breakages of ACCROPODE™ II and Xbloc™ units in an unusual proportion. The Région Réunion, as project owner, wished to entrust the expert assessment of the armour layers to a party independent of the consortium in charge of the works. The unit designers, CLI and Delta Marine Consultants, were working on behalf of this consortium. The Region therefore selected CLAS.

CLAS carried out an in-depth expert assessment of the armour layers, then provided technical monitoring of the remedial works.

ACCROPODE™: registered trademark owned by the ARTELIA group. Xbloc™: trademark of Delta Marine Consultants. None of these owners is affiliated with CLAS.

CLAS is independent of artificial armour unit licence vendors. These trademarks are mentioned on this page solely to identify the technologies or structures illustrated. Their mention does not establish any affiliation, representation, endorsement, partnership or commercial link between their owners and CLAS.

Key figures

NRL breakwater reconstruction with ACCROPODE™ II units after major repairs supervised by CLAS

Role of CLAS

  • Establish the causes of the breakages.

  • Carry out a global risk diagnosis.

  • Issue the recommendations required for the remediation of the defects and the resumption of construction works.

  • Monitor the remedial works requested by the Engineer in charge of design, construction supervision and works acceptance.

Blocs de carapace cassés sur la digue de la NRL

Result

The causes of the breakages were established, and a comprehensive risk diagnosis was carried out in relation to the contractual objectives of the project.

The Engineer in charge of design, construction supervision and works acceptance implemented major remedial works on the four structures, which were monitored by CLAS at the Engineer’s request.