The Project
YEAR : 2026
PROJECT : Extension du terre-plein et de la digue de l’Ile Rousse.
CONTRACTOR : NATALI.
OWNER : CCI de Corse.


Project Background
NATALI entrusted CLAS with preparing the placement drawings for the BS1 units installed on this project. CLAS also provided comprehensive support, including safety training and final certification of the works. The quality assurance documentation prepared by CLAS was incorporated into the as-built documentation by the supervising engineer.
Key Figures
- 420 blocks BS1 de 4 m3.

CLAS’s Role
Provide on-demand support during the technical solution design phase.
Prepare the placement drawings for the BS1 armour units.
Oversee personnel safety training.
Provide full-time assistance during the construction phase.
Meet or exceed production targets.
Achieve the required quality objectives.
Optimise construction costs.
Compile the quality certification dossier for the supervising engineer and the project owner.

Result
The works were completed on schedule and accepted without reservations. The breakwater was awarded CLASS A certification, and the certification dossier was included in the as-built documentation.