Cap Sicie Breakwater– BS1 Block, Assistance and Certification

The Project

YEAR: 2023
PROJECT: Repair of the Cap Sicié breakwater.
CONTRACTOR: VINCI.
PROJECT OWNER: SUEZ.

Réparation de la digue du cap Sicié avec des blocs BS1
Carapace reconstruite avec des blocs ACCROPODE™ récupérés et complétée avec des BS1

Project Background

TP SPADA, a VINCI subsidiary, entrusted CLAS with preparing the placement drawings for the BS1 units installed on this project. CLAS also provided comprehensive support, including safety training and final certification of the works. The quality assurance dossier prepared by CLAS was incorporated into the as-built documentation by the supervising engineer.

Key Figures

Fin de la reconstruction de la carapace de la digue du cap Sicié

CLAS’s Role

  • Provide on-demand support during the technical solution design phase.

  • Prepare the placement drawings for the BS1 armour units.

  • Oversee personnel safety training.

  • Provide full-time assistance during the construction phase.

  • Meet or exceed production targets.

  • Achieve the required quality objectives.

  • Optimise construction costs.

  • Compile the quality certification dossier for the supervising engineer and the project owner.

Fin de la reconstruction de la carapace de la digue du cap Sicié

Result

The works were completed on schedule and accepted without reservations. The breakwater was awarded CLASS A certification, and the certification dossier was included in the as-built documentation.