The Île Rousse breakwater construction has been successfully completed.
A CLAS diving team specialising in the placement of high-interlocking concrete armour units was mobilised throughout the project to supervise the construction works and prepare the complete breakwater certification dossier. Part of the existing ACCROPODE™ armour layer was dismantled and rebuilt to connect seamlessly with the new BS1 armour layer under the BREAKWATER SOLUTION™ programme.
Mission entrusted to CLAS
- Project-specific risk assessment.
- Preparation of the armour unit placement drawings.
- Training of all personnel involved in the handling and placement of ACCROPODE™ and BS1 armour units.
- Technical assistance to the Contractor during the installation of the armour units.
- Preparation of the Quality Assurance documentation.
ACCROPODE™ is a registered trademark owned by the ARTELIA Group, which is in no way affiliated with CLAS.
CLAS is an independent company, separate from license vendors, specializing in the implementation of highly interlocking artificial concrete blocks, regardless of the brand used.
Two CLAS experts were mobilised throughout the project to supervise the underwater operations.
The removal of the existing ACCROPODE™ armour units and the installation of the new BS1 armour units were performed by commercial divers in accordance with the approved placement methodology and CLAS quality assurance procedures.
Why Maritime Construction Companies Trust CLAS
Since its creation, CLAS has been committed to applying the highest standards of rigor and safety to guarantee the quality of your structures. Projects are delivered on time, with no reservations at acceptance.