Groupe de cinq blocs cassés visibles sur la digue de la Nouvelle Route du Littoral, révélant une zone fragilisée nécessitant une inspection approfondie.

La Réunion – NRL Breakwater Expertise (CLAS)

EGIS, Engineer in charge of design, construction supervision and works acceptance for the construction of the four NRL breakwaters, called on CLAS to assess the abnormally occurring damage on all the structures. The four NRL breakwaters showed abnormal breakages of ACCROPODE™ II units️ units. Neither the engineers of the contractors nor those of the license…

CLAS contrôle la pose des blocs sur le chantier de Barakah

Barakah – CLAS Assistance and Certification (NMDC)

The construction site for the protection breakwater of the water intakes of the BARAKAH nuclear power plant in Abu Dhabi had been halted. NMDC was required to place 110,000 CORELOC units on this project. The use of the POSIBLOC™ system led to the refusal of placement and to delays on the construction site. IDMer, now…

Vue drone de la digue de Kuantan construite avec l’assistance CLAS et certifiée CLASS A BREAKWATER

Kuantan – Certification CLAS (ECERDC)

The construction of the Kuantan breakwater was experiencing difficulties, and abnormal movements accompanied by multiple unit breakages appeared. ECERDC called on CLAS to assess the structure and then supervise the works. Several months were required to finalize the expert assessment of the structure and to formally establish the causes of the defects. This major structure…