Certification of the Zirku Island breakwater

The project

  • Year: 2014
    Project: Zirku Island – New Port
    Country: Abu Dhabi (UAE)
    Contractor: Archirodon
    Client: ADMA-OPCO
Plongeur CLAS se préparant à entrer dans l’eau sur l’île de Zirku
Chantier sur l’île de Zirku avec assistance technique CLAS

Background

Archirodon was tasked with constructing the breakwater of the new port on Zirku Island. The client, ADMA-OPCO, required certification of the quality of the armour layer built with ACCROPODE™ blocks, and the contractor was experiencing delays. Archirodon therefore called upon CLAS to assist with installation and optimization of the construction works.

ACCROPODE™ is a registered trademark owned by the ARTELIA Group and is in no way affiliated with CLAS.

CLAS’s independence from the license vendor made it possible to carry out an impartial certification with no risk of conflict of interest.

Key figures

Chantier sur l’île de Zirku avec assistance technique CLAS

The role of CLAS

  • Train installation teams in safety, technical procedures, and production.

  • Implement certification procedures.

  • Achieve quality and production objectives.

Imbrication des blocs en crête de digue sur l’île de Zirku

Result

Production targets were exceeded, and the installation was approved by the client ADMA-OPCO.