Background

CFE Qatar was experiencing difficulties on the Ras Laffan project, as the installation of ACCROPODE™ blocks had been rejected. The company then abandoned the POSIBLOC™ system and called upon IDMer, now CLAS, to provide full technical assistance. The objective was to correct ineffective installation methods and achieve the level of quality required by the client.

ACCROPODE™ is a registered trademark owned by the ARTELIA Group and is in no way affiliated with CLAS.

POSIBLOC™ is a registered trademark owned by the company MESURIS, which is also in no way affiliated with CLAS.

The independent expertise of IDMer, now CLAS, enabled CFE Qatar to restart the project without the disastrous procedures initially implemented, which were heavily affected by conflicts of interest.

Key figures

Vue du musoir achevé de la digue de Ras Laffan montrant la carapace en blocs artificiels.

Role of CLAS

The mission entrusted to CLAS:

CLAS intervened to:

  • train installation teams, both divers and non-divers, in safety procedures and block installation methods;

  • achieve the quality and production objectives set by the client.

Vue de la carapace finie en blocs artificiels, montrant l’imbrication régulière sur la digue.

Result

The production and quality objectives were achieved. The block installation was approved without reservations by the client, marking a major success for the Ras Laffan project and highlighting the value of engaging an independent service provider, free from license vendors and any conflict of interest.