Pose des blocs CORELOC™ sur la digue, réalisée sous la supervision directe des inspecteurs CLAS
Inspection sous-marine de blocs CORELOC par un plongeur CLAS.

Background

The installation of CORELOC™ units using the POSIBLOC™ system was rejected due to numerous non-conpliances. CLAS experts were therefore called upon to carry out an expert assessment of the structure, audit the construction site, and train diver teams in order to recover schedule delays.

POSIBLOC™ is a registered trademark owned by MESURIS, which is **in no way affiliated with CLAS.
CLAS’s independence from licence sellers guarantees full impartiality and an objective and rigorous expert assessment.

Key figures

Role of CLAS

  • Ensure follow-up of personnel safety training,

  • Provide full-time assistance during the construction phase,

  • Achieve or exceed the production objectives,

  • Achieve the quality objectives,

  • Recover schedule delays.

Pose des blocs CORELOC™ sur la digue, réalisée sous la supervision directe des inspecteurs CLAS

Result

The structure was delivered on schedule and without reservations at acceptance.