The project
YEAR: 2013
PROJECT: Barakah Nuclear Power Plant
COMPANY: NMDC
CLIENT: Emirates Nuclear Energy Corporation


Background
The installation of CORELOC™ units using the POSIBLOC™ system was rejected due to numerous non-conpliances. CLAS experts were therefore called upon to carry out an expert assessment of the structure, audit the construction site, and train diver teams in order to recover schedule delays.
POSIBLOC™ is a registered trademark owned by MESURIS, which is **in no way affiliated with CLAS.
CLAS’s independence from licence sellers guarantees full impartiality and an objective and rigorous expert assessment.
Key figures
- 100,000 CORELOC blocks of 1,4 m3.

Role of CLAS
Ensure follow-up of personnel safety training,
Provide full-time assistance during the construction phase,
Achieve or exceed the production objectives,
Achieve the quality objectives,
Recover schedule delays.

Result
The structure was delivered on schedule and without reservations at acceptance.