The project
YEAR: 2017
PROJECT: Al Faw Western Breakwater
COMPANY: Daewoo
CLIENT: Iraqi Government


Background
CLAS travelled to Al Faw, Iraq, to train Daewoo personnel in the installation of CORELOC units.
The training was intensive, with the objective of achieving rapid and high-quality placement of the units, both from a barge and on a slope.
Key figures
- 100,000 CORELOC
- 14.5 km long

Role of CLAS
Train Daewoo personnel in the installation of CORELOC units.

Result
The personnel were trained in above-water and underwater installation, achieving a high production rate.