IJM CHEC was responsible for the construction of the 4,600 meter long breakwater for the NEW DEEP WATER TERMINAL project in KUANTAN in MALAYSIA. 55,000 ACCROPODETMII were installed and checked.
CLAS has implemented the entire quality certification procedure to deliver a CLASS A project: conformity to design and conformity to DIT ACCROPODETMII.
As on all our sites, we have provided advice and recommendation to the contractor to achieve its production objectives and achieve the quality objectives required by the client.
These objectives have been achieved, which is why IJM CHEC gave us the following testimony: