The SOLIDERE company was to build the NEW MARINA in BEIRUT.
SOLIDERE entrusted the design work to DAR and the construction work to ARACO.
SOLIDERE awarded CLAS a contract to supervise all the work and a quality certification.
2457 ACCROPODE ™ of 12 m3 had to be installed.
CLAS intervened as an assistant to the SOLIDERE Contracting Authority with the mission of supervising the works and certifying the construction in CLASS A.
The ACCROPODE ™ structures built under the supervision of CLAS are located in the area affected by the explosion in the port of Beirut.
The joint expertise carried out after this explosion confirmed that there was no effect on the structures.
No broken, destabilized or extracted ACCROPODE ™.
The works have been certified "CLASS A".