YEAR: 2022-2023.

PROJECT: NORTH BREAKWATER OF ARGELES SUR MER PORT.

COUNTRY: FRANCE.

CONTRACTOR: BUESA-RAZEL-TDA.

CLIENT: CITY OF ARGELES SUR MER.

 

 

 

 

 

HISTORICAL:

The north breakwater of the port of Argeles sur Mer had suffered major disorders and had to be rebuilt.

The BUESA-EAZEL-TDA consortium won the contract.

The group of companies chose block BS2, free of license, and called on the expertise of CLAS to support it throughout this particularly complex project.

the consortium has signed the BREAKWATER SOLUTION™ quality charter which guarantees the construction of a class A structure while benefiting from the comprehensive services of the CLAS company.

 

 

KEY NUMBERS:

BS2 of 9 m3 = 800 units.

 

 

 

 

 

 

 

 


ASSIGNMENT:

The mission entrusted to CLAS was very broad:

- Realize the placing drawings.

- Train the staff of the consortium in the specific safety of this project and in the installation techniques implemented by CLAS.

- Accompany the installation of BS2 blocks on and under water.

- Prepare the quality certification file for a class A breakwater, in coordination with the engineersr SUEZ.

 

 

 


PROCEDURE:

CLAS mobilized a full team of divers, designers and experts.

 

 

 

 

 

 

RESULT:

The objectives have been achieved. The structure was protected in just five months despite the difficult winter conditions and certified as a CLASS A breakwater.

 

COMMENT FROM BUESA COMPANY

 

 

 

 

CLAS perpetuates this tradition of excellence and safety at the service of your projects