YEAR: 2022.
PROJECT: PORT LA NOUVELLE.
COUNTRY: FRANCE.
COMPANY: BOUYGUES TP.
CLIENT: OCCITANIA REGION.
HISTORICAL:
BOUYGUES TP had launched the construction of the new port of Port La Nouvelle.
The intervention of the CLAS company in 2021 made it possible to build and protect the offshore breakwater in record time and approved without reservation.
This structure suffered a violent storm with a recorded swell of 9.5 meters. No damage affected the construction carried out by CLAS.
In 2022 BOUYGUES TP was to complete the construction of the South dyke. The CLAS company intervened again to install ECOPODE™ and ACCROPODE™II.
KEY NUMBERS:
ACCROPODE™ II 12 and 14 m3 = approximately 800 units.
ECOPODE™ of 5 m3 = 81 units.
ACCROPODE™II of 4 m3 = approximately 1000 units.
ASSIGNMENT:
Install the ECOPODE™ and the ACCROPODE™II and protect the exposed parts,
in a very short time.
PROCEDURE:
CLAS mobilized the same team as in 2021.
RESULT:
The objectives have been achieved. The work was protected in just two months and approved without reservation.
CLAS perpetuates this tradition of excellence and safety at the service of your projects