YEAR: 2014-2015

PROJECT: NORTHERN BREAKWATER EXTENSION

COUNTRY: ROMANIA

CONTRACTOR: VAN OORD

CLIENT: GOVERNMENT

 

 

 


HISTORY:ACCROPODE™II,  ACCROPODE,   certification ACCROPODE, expertise ACCROPODE , placement ACCROPODE , pose ACCROPODE

The company VAN OORD was to build the extension of the dyke protecting the port of Constanta. The first line of ACCROPODE ™ II was 19 meters deep.

Visibility was

 

 

 

 

 

THE KEY NUMBERS :ACCROPODE™II,  ACCROPODE,   certification ACCROPODE, expertise ACCROPODE , placement ACCROPODE , pose ACCROPODE

7,000 ACCROPODE ™ II  3 m3.

8,500 ACCROPODE ™ II 9 m3.

1,000 ACCROPODE ™ II 12 m3.

 

 

 

 

THE MISSION :ACCROPODE™II,  ACCROPODE,   certification ACCROPODE, expertise ACCROPODE , placement ACCROPODE , pose ACCROPODE

CLAS acted as an independent consultant with the mission of:

Train all personnel in ACCROPODE ™ II specific safety.

Train ACCROPODE ™ II installation teams.

Ensure the interface between the company and CLI.

Establish and implement inspection procedures.

Issue the ACCROPODE ™ II armour quality certification documents.

 

PRODUCTION:ACCROPODE™II,  ACCROPODE,   certification ACCROPODE, expertise ACCROPODE , placement ACCROPODE , pose ACCROPODE

Production is calculated on the basis of actual installation hours. Stoppages due to bad weather, breakdowns and generally causes unrelated to the installation of ACCROPODE ™ II are not taken into account in this calculation.

ACCROPODE ™ II 3 to 9 m3: 8 units per hour.

ACCROPODE ™ II 12 m3: 6 units per hour.

 

 

 


PROCEDURE:ACCROPODE™II,  ACCROPODE,   certification ACCROPODE, expertise ACCROPODE , placement ACCROPODE , pose ACCROPODE

The CLAS inspectors intervened full time in order to carry out several daily    inspections and thus not delay the work by imposing significant dismantling.

The training of diving and non-diving personnel has been continuous in    order to maintain the highest level of safety and quality.

At the end of each inspection, a debriefing was organized with the placement team.

The inspections were carried out underwater by CLAS inspectors, IMCA and HSE certified, who strictly apply the principles defined in the registered trademark: CLAS TECHNOLOGY COMPLIANT™ and out of the water by walking and by boat.

 

 

 

 

ACCROPODE™II,  ACCROPODE,   certification ACCROPODE, expertise ACCROPODE , placement ACCROPODE , pose ACCROPODE    ACCROPODE™II,  ACCROPODE,   certification ACCROPODE, expertise ACCROPODE , placement ACCROPODE , pose ACCROPODE

 

RESULT:ACCROPODE™II,  ACCROPODE,   certification ACCROPODE, expertise ACCROPODE , placement ACCROPODE , pose ACCROPODE

The site was delivered on time and the armour in

ACCROPODE ™ II accepted without reservation by the customer.

CLAS A BREAKWATER certified by CLAS in accordance with the CLAS TECHNOLOGY COMPLIANT ™ registered trademark which specifies that independent inspections have confirmed compliance with the ACCROPODE ™ II design and technology.

 

 

 

 

 

VAN OORD'S COMMENT:

CLAS continues this tradition of excellence and security at the service of your projects

 

ACCROPODE™II,  ACCROPODE,   certification ACCROPODE, expertise ACCROPODE , placement ACCROPODE , pose ACCROPODE  ACCROPODE™II,  ACCROPODE,   certification ACCROPODE, expertise ACCROPODE , placement ACCROPODE , pose ACCROPODE  ACCROPODE™II,  ACCROPODE,   certification ACCROPODE, expertise ACCROPODE , placement ACCROPODE , pose ACCROPODE