PROJECT: CERBERE

COUNTRY: FRANCE

COMPANY: GUINTOLI

CUSTOMER: CITY OF CERBERE

 

HISTORY:ACCROPODE™II,  ACCROPODE,   certification ACCROPODE, expertise ACCROPODE , placement ACCROPODE , pose ACCROPODE

The Cerbere project is the first ACCROPODE ™ II project in Europe. The    GUINTOLI company had completed the construction of the core and the  underlayer at the end of August, it was necessary to protect before the arrival  of  storms in October.

IDMer, now CLAS, took up the challenge.

 

 

 

 


KEY FIGURES:ACCROPODE™II,  ACCROPODE,   certification ACCROPODE, expertise ACCROPODE , placement ACCROPODE , pose ACCROPODE

628 ACCROPODE ™ II of 9 m3.


MISSION:

Install the ACCROPODE ™ II shell in record time.

 

 


PRODUCTION:ACCROPODE™II,  ACCROPODE,   certification ACCROPODE, expertise ACCROPODE , placement ACCROPODE , pose ACCROPODE

Production is calculated on the basis of actual installation hours.

Stoppages due to bad weather, breakdowns and generally causes unrelated to  the  installation of ACCROPODE ™ II are not taken into account in this calculation.

ACCROPODE ™ II of 9 m3 in straight section: 8 units / hour.
ACCROPODE ™ 9 m3 in head: 6 units per hour.

 


PROCEDURE:ACCROPODE™II,  ACCROPODE,   certification ACCROPODE, expertise ACCROPODE , placement ACCROPODE , pose ACCROPODE

CLAS inspectors were only able to work in the morning due to difficulties in supplying  and storing ACCROPODE ™ II.

 

Despite this, the objective has been achieved. A severe storm struck the structure without causing damage.

 

 

 

ACCROPODE™II,  ACCROPODE,   certification ACCROPODE, expertise ACCROPODE , placement ACCROPODE , pose ACCROPODE

The installation was done on sight, by CLAS inspectors with a cable crane and a very  good operator supplied by GUINTOLI and trained by IDMer which became  CLAS.

 

 

 

 

 

 

RESULT:ACCROPODE™II,  ACCROPODE,   certification ACCROPODE, expertise ACCROPODE , placement ACCROPODE , pose ACCROPODE

The project was completed on time and received without reservation.

This dam has suffered several severe storms since its construction.

We filmed it in 2018 and saw no mess.

No ACCROPODE ™ II broken or visibly moved.

 

 

 

 

CLI wrote about us:


“A storm hit the unfinished structure on October 10, but caused only minor disruptions in the works and only a few days late in the completion of the structure, in particular thanks to the decision of the Enterprise d 'hire an experienced diver to place the ACCROPODE™II'.

The “experienced diver” is actually IDMer, now CLAS, which brought in two of its inspectors. We organized the site and carried out the installation of ACCROPODE ™ II blocks ourselves.

 

CLAS continues this tradition of excellence and security at the service of your projects

 

ACCROPODE™II,  ACCROPODE,   certification ACCROPODE, expertise ACCROPODE , placement ACCROPODE , pose ACCROPODE  ACCROPODE™II,  ACCROPODE,   certification ACCROPODE, expertise ACCROPODE , placement ACCROPODE , pose ACCROPODE  ACCROPODE™II,  ACCROPODE,   certification ACCROPODE, expertise ACCROPODE , placement ACCROPODE , pose ACCROPODE

 

Videos: ACCROPODE ™ II placement Breakwater CLASS A Cerbere

Third Party Video: ACCROPODE ™ II Storm 2013 Cerbere