YEAR: 2012-2013

PROJECT: ZAKUM WEST ISLAND

COUNTRY: ABU DHABI

COMPANY: NMDC

CLIENT: ADNOC

 

 

 

ACCROPODE™II,  ACCROPODE,   certification ACCROPODE, expertise ACCROPODE , placement ACCROPODE , pose ACCROPODE

 

HISTORY:

NMDC was to build four oil islands on the ZAKUM site. Two with X-bloc® and  two with ACCROPODE ™ II.

IDMer-CLAS inspectors assisted NMDC full-time.

 

 

 

THE KEY NUMBERS :ACCROPODE™II,  ACCROPODE,   certification ACCROPODE, expertise ACCROPODE , placement ACCROPODE , pose ACCROPODE

West ZAKUM Island: 43,000 ACCROPODE ™ II of 4 m3.

 

 

THE MISSION :

 

IDMer become CLAS intervened as an independent consultant with the mission:

Train all staff in specific safety for ACCROPODE ™ II.ACCROPODE™II,  ACCROPODE,   certification ACCROPODE, expertise ACCROPODE , placement ACCROPODE , pose ACCROPODE

Train ACCROPODE ™ II installation teams.

Ensure the interface between the company and CLI.

Establish and implement certification procedures.

Issue the certification documents.

 

 

 

PRODUCTION:ACCROPODE™II,  ACCROPODE,   certification ACCROPODE, expertise ACCROPODE , placement ACCROPODE , pose ACCROPODE

Production is calculated on the basis of actual installation hours. Stoppages due to bad weather, breakdowns and generally causes unrelated to the installation of X-bloc ® or ACCROPODE ™ II are not taken into account in this calculation.

NMDC used the ECHOSCOPE associated with divers to pose.

ACCROPODE ™ II: 8 units per hour.

 

 

PROCEDURE:ACCROPODE™II,  ACCROPODE,   certification ACCROPODE, expertise ACCROPODE , placement ACCROPODE , pose ACCROPODE

The CLAS inspectors intervened full time in order to carry out several daily inspections and thus not delay the work by imposing significant dismantling.

The personnel responsible for installing the ACCROPODE ™ II have been trained and supervised continuously to maintain the highest level of safety and quality.

The inspections were carried out underwater by IMCA and HSE certified CLAS inspectors, who strictly apply the principles defined in the CLAS TECHNOLOGY COMPLIANT ™ trademark and out of the water by foot and by boat.

 

RESULT:ACCROPODE™II,  ACCROPODE,   certification ACCROPODE, expertise ACCROPODE , placement ACCROPODE , pose ACCROPODE

The work was delivered on time and received without reservation.

 

 

 

 

 

 

NMDC COMMENTS:

Mail sent to IDMer become CLAS:

"I would like to thank you personally for the great contribution to the ZAKUM project with the placement of X-bloc ® and ACCROPODE ™ II and mainting the good relationship during execution of the works, with all on site and the client as well.

IDMer really showed great professionalism during the execution of the project and contributed to the success we have achieved as 1 team ”.

 

CLAS continues this tradition of excellence and security at the service of your projects

ACCROPODE™II,  ACCROPODE,   certification ACCROPODE, expertise ACCROPODE , placement ACCROPODE , pose ACCROPODE  ACCROPODE™II,  ACCROPODE,   certification ACCROPODE, expertise ACCROPODE , placement ACCROPODE , pose ACCROPODE  ACCROPODE™II,  ACCROPODE,   certification ACCROPODE, expertise ACCROPODE , placement ACCROPODE , pose ACCROPODE