YEAR: 2009-2010
PROJECT: KHALIFA PORT
COUNTRY: ABU DHABI
CONTRACTOR: ARCHIRODON
CLIENT: ADPC
HISTORY :
Archirodon was exposed to late penalties and called on IDMer, now CLAS, to assist it.
KEY FIGURES :
220,000 ACCROPODE from 0.8 to 2 m3.
MISSION:
Train the teams.
Achieve quality and production target.
Set up and carry out quality certification.
PRODUCTION:
We applied 8 ACCROPODE ™ / hour on average.
PROCEDURE:
The CLAS inspectors intervened full time in order to carry out several daily inspections and thus not delay the work by imposing significant dismantling.
The personnel responsible for installing the ACCROPODE ™ have been trained and supervised continuously to maintain the highest level of safety and quality.
RESULT:
The production targets were exceeded and the work approved by the client.
CLAS continues this tradition of excellence and security at the service of your projects
Vidéo: https://www.youtube.com/watch?v=TzwKLuB5DU0