ACCROPODE™II,  ACCROPODE,   certification ACCROPODE, expertise ACCROPODE , placement ACCROPODE , pose ACCROPODE

YEAR : 2007-2008

PROJECT : DUNG QUAT PORT PROJECT

COUNTRY : VIETNAM

CONTRACTOR : VAN OORD

CLIENT : PETROVIETNAM

 

 

 

ACCROPODE™II,  ACCROPODE,   certification ACCROPODE, expertise ACCROPODE , placement ACCROPODE , pose ACCROPODE

HISTORY

VAN OORD was falling behind on this project and was liable to    penalties. 

VAN OORD called upon IDMER, now CLAS, to achieve quality and    production objectives.

 

 

 

 

 

 

KEY FIGURES:ACCROPODE™II,  ACCROPODE,   certification ACCROPODE, expertise ACCROPODE , placement ACCROPODE , pose ACCROPODE

5 500 ACCROPODE™ 2 m3.

3 900 ACCROPODE™ 4 m3.

6 200 ACCROPODE™ 6,3 m3.

4 700 ACCROPODE™ 9 m3.

1 000 ACCROPODE™ 12 m3.

 

 

THE MISSION :ACCROPODE™II,  ACCROPODE,   certification ACCROPODE, expertise ACCROPODE , placement ACCROPODE , pose ACCROPODE

IDMer acted as an independent consultant with the mission:

Train and supervise the ACCROPODE ™ placement teams.

Train the site supervisor.

Train all personnel in ACCROPODE ™ specific safety.

Ensure the interface with SOGREAH and the client representative.

Optimize production.

Optimize quality.

 

PRODUCTION:

Production is calculated on the basis of actual installation hours. Stoppages due to bad weather, breakdowns and generally causes unrelated to the installation of ACCROPODE ™ are not taken into account in this calculation.

Taiwanese and Vietnamese divers. Production with approved quality following the training and the training given by the agents of IDMer: ACCROPODE™II,  ACCROPODE,   certification ACCROPODE, expertise ACCROPODE , placement ACCROPODE , pose ACCROPODE

ACCROPODE ™ 2 to 6.3 m3 in straight section: 8 units per hour.

ACCROPODE ™ 9 m3 in straight section: 8 units per hour.

ACCROPODE ™ 12 m3 in head: 5 units per hour.

 

 

 

 

 

PROCEDURE :ACCROPODE™II,  ACCROPODE,   certification ACCROPODE, expertise ACCROPODE , placement ACCROPODE , pose ACCROPODE

The inspectors of IDMer, now CLAS, intervened several times

times a day at each ACCROPODE ™ installation station so as not to

delay work by major dismantling.

Inspections were carried out on and underwater and each inspection    yielded debriefing with the ACCROPODE ™ installation team.

 

 

 

 

RESULT:ACCROPODE™II,  ACCROPODE,   certification ACCROPODE, expertise ACCROPODE , placement ACCROPODE , pose ACCROPODE

The site was delivered several months in advance and the armor in

ACCROPODE ™ accepted without reservation by the client.

 

 

 

 

 

 

VAN OORD'S COMMENT :

This first project with VAN OORD marked the start of a long collaboration

CLAS continues this tradition of excellence and security at the service of your projects

    

  