HISTORY:
The ACCROPODE ™ protection has started to deteriorate
before acceptance of the works.
THE KEY NUMBERS:
350 ACCROPODE ™ of 6 m3.
930 ACCROPODE ™ of 4m3.
THE MISSION :
Eric SKIERNIEWSKI intervened personally as a judicial expert appointed by the Administrative Court of Montpellier with the mission:
Establish the cause of the disorders.
Establish the cost of repairs.
PROCEDURE:
Detailed inspection of the ACCROPODE ™ shell
and studies of the design and construction file.
RESULT:
The causes of the disorders have been identified and the cost of repairs
has been calculated. This work awaiting repair has been seriously
damaged and must be rebuilt. From this expertise,
ACCROPODE ™ larger are recommended in this portion of the Mediterranean.