CFE ACCROPODE™ RAS LAFFAN QATAR

The company CFE QATAR has seen the installation of ACCROPODE refused by CLI. Major dismantling was requested and CFE QATAR was behind schedule in the construction of the dikes. CFE called on our previous company, IDMer, which has become CLAS, to bring the quality of the installation to its highest level and greatly increase production.

CFE had entrusted IDMer with the training of the installation teams and the inspections of all the ACCROPODE installed. The inspectors of IDMer, now CLAS, have continuously trained and assisted the laying teams and divers to achieve quality objectives and increase production.

CFE and its client QATAR PETROLEUM were satisfied and CFE gave us the following testimony:

Name *  
Email *  
Message *  


* required field

PRAT DE BAIX EDIFICI F PB3, SOLDEU, AD100 CANILLO
+376 354 698 / +336 161 602 74
e...@clascertification.com

Clas certification - 2018 - Tous droits réservés - Mentions légales - Design : Pygmalis - Intégration : Ingeitec